Back to Projects
Under ConstructionCommercial Development

Westlands Commercial Mixed-Use Complex

Westlands, Nairobi, Kenya
2024-2026
85,000 square meters GFA

Client

Private Development Consortium

Duration

36 months

Project Value

KES 52.6 Million

Project Overview

An iconic mixed-use development transforming a prime Westlands location into a world-class commercial and residential destination. This landmark project integrates Grade A office towers, upscale retail spaces, luxury residential units, and modern amenities into a cohesive urban ecosystem. The development emphasizes sustainability, smart building technology, and pedestrian-friendly design while meeting international standards for commercial and residential construction.

Project Scope

Deliverables:
  • Twin 22-story office towers, 12-story residential block, retail promenade, parking (600+ spaces)
  • Rooftop gardens, fitness center, conference facilities
  • LEED Gold certification documentation
  • Features/Functionalities:
  • Smart building management, high-speed elevators, green spaces
  • Timeline & Milestones:
  • Construction: 36 months (2024-2026)
  • Key milestones: Foundation, superstructure, fit-out, certification
  • Budget/Resources:
  • Value: KES 52.6 Million
  • Constraints/Assumptions:
  • Urban site logistics and regulatory approvals
  • Assumes stable market demand for commercial/residential units
  • Out-of-scope:
  • Tenant fit-out and leasing
  • Ongoing property management

Key Features

  • Twin 22-story office towers
  • 12-story luxury residential block
  • Ground-level retail promenade
  • Rooftop gardens and recreational spaces
  • Multi-level underground parking (600+ spaces)
  • Smart building management systems
  • High-speed elevators and modern lobbies
  • Conference and business center facilities
  • 5-star fitness and wellness center
  • Outdoor plaza and event spaces

Project Team

  • P

    Project Director

  • S

    Senior Architect

  • S

    Structural Engineer

  • M

    MEP Design Engineer

  • C

    Construction Manager

  • S

    Sustainability Consultant

Challenges

  • 1.Dense urban construction in congested business district
  • 2.Complex foundation work in challenging soil conditions
  • 3.Integration of multiple building types and uses
  • 4.High-rise construction logistics and material delivery
  • 5.Meeting Green Building Certification requirements

Solutions

  • Advanced piling and foundation systems for high-rise stability
  • Coordinated construction scheduling with minimal neighborhood disruption
  • Unified architectural design language across different building types
  • On-site batching plant and vertical material transport systems
  • LEED Gold design incorporating energy-efficient systems and green spaces

Project Outcomes

45,000 m² of Grade A office space

180 luxury residential apartments

15,000 m² of retail and dining facilities

LEED Gold certification achievement

Major contribution to Nairobi's premium real estate inventory

Interested in Working With Us?

Let's discuss how BMI Associates can bring your vision to life with our expertise and innovation.

Get in Touch